Maritime Impact

Polargold 2019

Historically, Maritime Impact was as a regularly published print magazine by DNV GL, a global leader in classification and assurance. We reimagined it as a digital-first, interactive content hub, transforming static pages into a dynamic experience.

Focused on shipping innovations and maritime trends, the platform earned the nickname Instagram for Engineers from its users.

Dnv gl maritime impact feature

A modern, whitespace-rich layout invites exploration. The interface is clean, calm, and purposefully structured. Users can dive into a sea (pun intended) of content with intuitive filters that surface what truly matters to them.

While rooted in maritime themes, the topics span innovation, technology, and sustainability, making the platform as wide-ranging as the industry itself. Interactions, woven into the experience in ways that were revolutionary for this field.

Let the images speak. Articles open with bold, cinematic imagery, setting the tone before a single word is read. As users scroll, images move with the viewport, creating a reading experience that feels fluid and immersive.

It’s been an adventure, one that blended creativity, engineering, and specialized industry content. Beyond being a deeply rewarding project, Maritime Impact was also recognized with two design awards.

Up next

About